1st Quarterly River Coalition in Cambodia Meeting in 2017


On 2nd – 3rdFebruary 2017, Phnom Penh, the 1st Quarterly River Coalition in Cambodia(RCC) Members Meeting in 2017 was organized. The meeting was hosted by Community Rights on Hydropower Development Policy Monitoring Project Coordinator of the NGO Forum on Cambodia as a vital role of RCC’s secretariat. There are 22 participants (6 women) who represented for both national and international NGOs attended the meeting. The overall objective of the meeting was focused on sharing and updating on emerging issues of hydropower development on the Mekong mainstream and step forward to advocacy to benefit for community rights and sustainable use of natural resources.


The meeting wasdefined advocacy approaches for specific cases includes (i) Lower Sesan 2 hydropower in Stung Treng province, (ii) the proposed new dam in Sambor, Stung Treng and Sekong, Cambodia (iii) Don Sahong case and new proposed dam in PekBeng, Lao. Importantly, the meeting was come up with key action towards CSOs campaigns and dialogues on the issues of water governance in Mekong Region. See results of discussion as below:

  1. Lower Sesan 2 hydropower, Cambodia: the project is the first large dam development in Cambodia along the Sesan River located in Stung Treng Province. It will provide capacity power with 400MW for using in the country. Based on our findings, the project it will bring more negative impacts to the ecosystem of the Mekong Tributaries Sesan and Srepok River. It’s one thousand households and other communities that living along the river will be resettled because of the dam reservoir from this project will destroy up to 30,000 ha of forest areas, including 10,000 ha of private forest concession.

Currently, there are some of concerns were raised by local people and dam- affected communities such as: (i) Relocated communities (new settlement communities) are do not happy within $6,000 US dollars of compensation and as well as house building, which provided by dam project developer, because of those amounts are do not enough for them to start up with new house. In additional, for house building which provided by company it’s doesn’t go through living standard for local people and some of those house have been cracked and rain leaked can’t use. (ii) Relocation communities are facings many problems related to their health and livelihoods, because the new area is not good enough quality of water resources and soil for them to access traditional crop plantation, livestock and animal raising, especially sustainable food security. (iii) the final decision making from Disagree-relocation communities “We don’t leave from our village because it’s great place for my people and other villagers to rely on such as fishing, crop crowing and Non-timber products harvesting. We scarify to die here in our village even the dam has been closed gate and/ or flooded into my village.” said, Mr. HortKhouern, representative from SreKorvillage.

  1. Proposed new dam in Sambor, Stung Treng and Sekong, Cambodia: the feasibility study was conducted in year 2007. The proposed Sambor hydropower dam would be the one biggest of dam constructed on the Mekong mainstreaming in Cambodia. As plan, there are plans to construct a further 11 dams on the Lower Mekong mainstream, including 9 in Laos and 2 in Cambodia. Currently, the Council Ministry of Cambodia has announced for conducting environmental impact assessment for the project. Through this hot new information, community people who live along Mekong river in Sambor district, Kratie province includes Tonle Sap communities are very concerned. If the dam will be constructed it would be hugely damage of biodiversity and negative impacts to livelihoods.

  2. Donsahong hydropower, Lao: The 260 MW Don Sahong Dam is one of eleven hydropower projects currently under construction on the lower Mekong River after Xayaburi. It is located less than 2 kilometers from the Lao-Cambodian border in Champasak Province, Lao PDR. If the dam built, it will block the HouSahong channel, the main Mekong channels through the Khone Falls area that sustains year-round fish passage.The dam is being built by China’s Sinohydro International, a subsidiary of Power China as Mega First has already negotiated with this Chinese company to sign the dam’s Engineering, Procurement and Construction (EPC) agreement.

Lao, Cambodia and Malaysian government have to responsible for the dam impact because villagers have already raised their concern and opposition to the dam but have not received any meaningful response yet.

To address this concern, both national and international institutions have released their statements and called for urgent intervention on Don Sahong case. For instance, The Rivers Coalition Cambodia (RCC), together with international conservation groups Conservation International (CI), Oxfam, World Wide Fund for Nature (WWF), and other 15 local NGOs and International NGOs (INGOs), was shared a joint statement to raise strong concerns over the Procedures for Notification, Prior Consultation and Agreement (PNPCA) process for the Don Sahong Hydropower Project (DSHPP). In addition, civil society groups are calling for consideration of the concerns of people living in the Mekong River areas over the development of the Don Sahong Hydropower Dam in Laos and the development of hydropower dams on the Mekong mainstream in the ASEAN-U.S. Summit was happened on 15-16 February 2016 in Sunny Lands, Rancho Mirage, California, the United States of America. Furthermore, the United Nations Special Procedures has detailed concerns over the controversial dam under construction on the Mekong River in Laos. The institution jointly wrote to the Government of Laos, the Mekong River Commission, Malaysian project developer Mega First Corporation Berhad, and the Malaysian government raising their concerns in February and again in March 2016. They have not yet received any replies. Unfortunately, series of advocacy activities and campaigns have been not found any results yet.

  1. Pak Beng hydropower, Lao:the proposed Pak Beng Hydropower Dam would be the third dam constructed on the Mekong mainstreaming in Lao PDR. The project is situated in Oudomxay Province, northern Laos. The dam is a ‘run-of-river’ project with the capacity to generate 912 MW of electricity. According to reports, the company responsible for building the Pak Beng Hydropower dam, Vientiane-based Datang (Lao) Pak Beng Hydropower Co., Ltd., commits to respond to comments by member countries of the Mekong River Commission (MRC) and development partners.

Currently, Mekong River Commission (MRC) of the Prior Consultation for the Pak Beng dam under the Procedures for Notification, Prior Consultation and Agreement (PNPCA).

However, the PNPCA, and the Prior Consultation procedure in particular, has been the subject of significant critique and concern from stakeholders across the region since the first project on the Mekong mainstream, the Xayaburi dam, underwent the procedure in 2011. Despite clear expressions of concern and strong responses from the member countries of the MRC against the construction of the Xayaburi dam, and requests for a ten year moratorium on dam-building and further studies including basin-wide assessments, the Lao government moved forward with the project. In spite of unresolved concerns over Xayaburi and the impacts of damming the Mekong mainstream, the Government of Lao commenced construction of a second project, the Don Sahong dam, in 2016. As with the process for Xayaburi, significant concerns and opposition from neighboring governments, requests for baseline assessments and trans-boundary impact assessments went unanswered. The approval of the concession contract by the Lao parliament for the construction of the Don Sahong dam was made when requests by the three member countries of the MRC, i.e. Cambodia, Thailand, and Vietnam, as well as downstream communities and civil society organizations, had not been responded to or addressed. For both Xayaburi and Don Sahong, no clear responses were ever given to many of the questions raised in the MRC secretariat technical reviews.

Experience to date shows little evidence that the concerns raised during Prior Consultation procedure will have any meaningful impact on decision-making. For both Xayaburi and Don Sahong, the procedure failed in its objective to ensure cooperation for the sustainable and equitable use of the Mekong River, as no agreement was reached between the governments on addressing the issues and the Prior Consultation procedure could not be formally resolved.

The MRC, and its international development partners, have recognized flaws and inadequacies in the Prior Consultation procedure. The MRC has stated that it will undertake a review of the PNPCA; however no information on the status or outcome of that review has been made public. Furthermore, the MRC Council Study, agreed on by all four members of the MRC in 2011 as a basin-wide assessment of the impacts of Mekong mainstream dams, has been subject to significant delays and remains incomplete.

The construction of the Pak Beng hydropower dam will seriously affect communities in Thailand who live upstream and downstream of the proposed dam. Furthermore, it threatens to biodiversity and fisheries in the Lower Mekong, which is the source of food security for millions of people, and especially in the Tonle Sap Lake, which is the heart of Cambodia.

The Rivers Coalition in Cambodia (RCC) agrees with the concerns of international organizations, including International Rivers, which issued a statement urging the MRC and member countries to immediately address the shortcomings of the PNPCA, and the unresolved concerns between Cambodia, Thailand, and Vietnam, with respect to the construction of the Xayaburi and Don Sahong dams before considering any new project on the Mekong mainstreaming.

We, members of the Rivers Coalition in Cambodia (RCC), and national and international civil society organizations, request that Mekong River Commission halts the Prior Consultation for the Pak Beng hydropower dam, and officially request the Lao Government to suspend activities on all projects in order to address the shortcomings of the PNPCA and ensure its effectiveness. We further demand that the procedure should be suspended until the MRC Council Study is completed and the results made public. We urge the Cambodian government to recognize and support these requests.

Comments


Jul 19, 2024

National Consultative Seminar on Indigenous Communal Land
On 19 July 2024, Indigenous Community Support Organizations in collaboration with the NGO Forum on Cambodia and other partner organizations organized a National Consultative Seminar on Indigenous Communal Land (ICLT) in Kampong Cham Province. This national consultation seminar was cooperated by relevant ministries, including the Ministry of Rural Development, the Ministry of Interior, the Ministry of Land Management, Urban Planning and Construction, the Ministry of Agriculture, Forestry and Fisheries, and the Ministry of Environment, with the participation of authorities, community representatives, civil society organizations and development partners with a total of 158 participants (37 females). Achievements and research results, challenges and suggestions were brought for discussion during the seminar. Dr. Thol Dina, Project Director of LASEDIII of the Ministry of Land Management, Urban Planning and Construction, mentioned the previous community registration, which resulted in 193 communities being recognized by the Ministry of Rural Development, 153 communities recognized as legal entities by the Ministry of Interior and 43 communities officially recognized by the Ministry of Land Management. Please be informed that Mr. Soeung Saroeun, Executive Director of the NGO Forum on Cambodia (NGOF) urges consideration of planning for resource and community development projects in addition to the current dialogue. In general, the content from the discussion, suggestions and recommendations are compiled and prepared as key notes for submission to the relevant ministry leaders for further discussion and address.

Add a Title

Jul 16, 2024

Workshop on revisiting CSOs’ Input to new National Strategic Development Plan (NSDP) 2024-2028
First of all, we would like to congratulate the NGO Forum on Cambodia (NGOF) that has been officially appointed by the Royal Government of Cambodia through the Ministry of Planning, as one of the members of Inter-Ministerial Committee and Technical Working Group for preparation of the new National Strategic Development Plan (NSDP) 2024-2028. To play this critical role, on 9 January 2024, the NGOF organized a consultative workshop on Revisiting CSOs’ Inputs to new National Strategic Development Plan (NSDP) 2024-2028 with around 80 participants both in person and virtual who are from the Ministry of Planning, NGOF’s member organizations, networks and development partners. Honorable guests and participants applauded the process and regarded that the NSDP is the most important document to drive development process in Cambodia so that all stakeholders should put all efforts to provide inputs and develop this plan. The full-day workshop aims to raise awareness of the first phase of the Pentagonal Strategic Plan and provide up-to-date information on the NSDP 2024-2028 process to civil society organizations that are members and partners of the NGOF, as well as present format to generate inputs from participants for the NSDP 2024-2028 that will then submit to each relevant ministry, Ministry of Planning and members of the Inter-Ministerial Committee. As a result of this consultation, participants have learned about the pentagonal strategies, process of NSDP preparation, and especially provided a lot of useful inputs which will be formulated into the CSO’s inputs paper to be submitted to the Government. Participants will encourage other CSO representatives and stakeholders in their contacts to provide further inputs online until 12 January 2024. The NGOF will consolidate the first collective inputs and will submit it to the line Ministries and Ministry of Planning in the week of 15 January 2024 onward. The NGO Forum and participants also strongly encourage all other CSOs to continue to provide inputs through online until the first draft of NSDP shared by the Ministry of Planning, tentatively in the second half of March/April 2024. Relate Document: https://drive.google.com/drive/folders/1acpHAOzjTPpdOeo1gcfUvhNjYzS3pxcp?usp=drive_link&fbclid=IwAR3y7ivHzu6i9iVLNm2UUS1q3G3FLvidaC5V4829eGABynslBtQxxxraOUA

Add a Title

Oct 25, 2023

Provincial NGO Network Members Meeting at Preah Vihear Province
On the morning of 17 October 2023, Mr. Soeung Saroeun, Executive Director of the NGO Forum on Cambodia (NGOF) and colleagues had conducted a consultative meeting with NGO members and partners in Preah Vihear to strengthen collaboration, and consult on a draft of NGOF's seven-year strategic plan (2024-2030) called "METRI" which is focusing on Multi-stakeholders Engagement for Transformative, Resilient, and Inclusive Society. As a result, our discussion was successfully proceeded, with good inputs and support from participants of "METRI" strategic plan. In addition, the NGO members and partners were happy to participate in joint initiatives based on the model to achieve common goals, and they specifically request that the NGOF remain active in supporting the positive impact on policies and laws influence and resource mobilization for the benefits of member organizations, communities and especially poor and vulnerable people.

Add a Title

Popular Article
bottom of page